GM extends Chevy Bolt EV production shutdown another two weeks

GM has extended a shutdown at its Orion Assembly Plant another two weeks due to a battery pack shortage related to the widespread Chevrolet Bolt EV and Bolt EUV safety recall.

GM said the extended downtime at the Orion plant will last through September 20. Orion Assembly Plant in Michigan has been shut down since August 23.

The recall, which now includes all Chevy Bolt EV and EUV models made since 2017, was issued after the automaker discovered two manufacturing defects in the battery cell that could increase the risk of fire. The possible fire risk prompted GM to recommend Bolt owners set the vehicle to a 90% state

Related News

How to Overcome Imposter Syndrome and Launch Your First Product with Confidence

Intel was on the brink of downfall. A twist in the AI race could boost its revival

Incident involving suspect with a knife closes Hwy. 101 in San Jose

Scott Pelley speaks: ‘CBS News is on fire’ and Bari Weiss should be removed

5 vehicles stolen from Alameda County parking garage in Oakland

Video footage shows large groups of people fighting in Oakland